Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
  • HOME
  • PEO ACWA
    • ACWA logo

      Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)


      Mission: The safe elimination of chemical weapons at Pueblo and Blue Grass by Sept. 30, 2023

    • About PEO ACWA
      • Destruction Progress
      • Chain of Command
      • Team Biographies
      • Program Timeline
      • Program Legislation
      • Public Involvement
      • Frequently Asked Questions
    • PEO ACWA Media Library
      • PEO ACWA News
      • PEO ACWA Videos
      • PEO ACWA Facts
      • PEO ACWA Press Releases
      • PEO ACWA Briefings, Reports & Downloads
  • BLUE GRASS
    • pcapp_logo
      Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP)

      BGCAPP is safely destroying the chemical weapons stockpile currently in storage at the Blue Grass Army Depot near Richmond, Kentucky.

    • BGCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
      • Hydrolysate Shipments
    • BGCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • PUEBLO
    • pcapp_logo
      Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP)

      PCAPP is safely destroying the chemical weapons stockpile currently in storage at the U.S. Army Pueblo Chemical Depot in Colorado.

    • PCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
    • PCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • CONTACT US

Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Recap – October 2022

Published: October 27, 2022 | Category: BGCAPP News, Monthly Recap

Highlights

Main Plant Update:

  • The main plant is using neutralization to destroy nerve-agent munitions. During operations, hydrolysate and non-agent-contaminated rocket motors, both considered secondary waste, are being shipped to permitted waste disposal facilities for final destruction.
  • GB nerve agent 8-inch projectile destruction began in January 2020 and was completed in May 2020.
  • VX nerve agent 155mm projectile destruction began in January 2021 and was completed in May 2021.
  • VX nerve agent M55 rocket destruction began in July 2021 and was completed in April 2022.
  • The first M55 rocket containing GB nerve agent was destroyed July 6, 2022.
  • This Month:
    • As of Oct. 21, 14.9% of the GB rockets have been destroyed
    • Preparation for November chemical-agent demonstration test to determine efficiency of agent destruction
    • Continuing tuning of destruction equipment

Static Detonation Chamber (SDC) 2000 Update:

  • The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will use this SDC unit to destroy a portion of the nerve-agent munitions, including full rocket overpacks and secondary waste products from destruction of the nerve-agent rockets, such as containerized drained GB rocket warheads.
  • This Month:
    • Start of testing with simulated containerized rocket warheads
    • Start of surrogate testing to closely simulate destruction of chemical agent
    • Continuation of Electronic Security System endurance test

SDC 1200 Update:

  • BGCAPP is converting the Explosive Destruction Technology (EDT), previously used to destroy the mustard-agent munitions, into the SDC 1200. This SDC unit will destroy secondary waste products from destruction of the nerve-agent rockets, containerized drained VX rocket warheads, and potentially containerized drained and undrained GB rocket warheads.
  • This Month:
    • Installation of analytical gas tubing in Off-gas Treatment System Building for air-monitoring system
    • Placement of concrete for crosswalk and access road
    • Installation of conduit and pulling cables

EDT Facility

  • The EDT facility at BGCAPP used an SDC to destroy the mustard-agent munitions.
  • Mustard-agent 155mm projectile destruction began in June 2019 and was completed in September 2021.

Upcoming Meetings

The next Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Chemical Destruction Community Advisory Board meeting will be held:
Dec. 14, 2022, at 1:30 p.m. ET
Carl D. Perkins Building, Rooms A and B
Eastern Kentucky University
Richmond, Kentucky

For information about the meeting, contact the Blue Grass Chemical Stockpile Outreach Office at (859) 626-8944 or bgoutreach@iem.com.

New to BGCAPP?

The Blue Grass Chemical Agent-Destruction Pilot Plant is a state-of-the-art facility safely destroying the chemical weapons stockpile in storage at the Blue Grass Army Depot near Richmond, Kentucky. The main plant is using neutralization to destroy the nerve-agent stockpile. The decision was made to not use the supercritical water oxidation system to process hydrolysate, the product of the neutralization process. This secondary waste is shipped to a licensed and permitted hazardous waste treatment, storage and disposal facility. A Static Detonation Chamber (SDC) destroyed the mustard agent stockpile. This SDC, along with a larger SDC 2000, will augment the main plant by destroying drained rocket warheads and overpacked rockets, and potentially undrained rocket warheads. The safety of the workforce and the environment, as well as of the neighboring communities, is the program’s most important priority.

  • Kentucky Workers Prepare for Next Campaign

    Kentucky Workers Prepare for Next Campaign

    Published: August 12, 2020
  • Video: Robots Take Apart Nerve Agent-filled Rockets

    Robots Take Apart Nerve Agent-filled Rockets

    Published: April 20, 2018
  • Video: Piping Pressure Builds at Blue Grass Plant

    Piping Pressure Builds at Blue Grass Plant

    Published: February 8, 2018
No tags.

  • About PEO ACWA
  • History of PEO ACWA
  • Chain of Command
  • Team Biographies
  • Program Timeline
  • Public Involvement
  • Job and Business Opportunities

Connect with PEO ACWA

Sign Up for Our Newsletter

Sign up for the Connect with ACWA e-newsletters to have information sent directly to your inbox. It’s a great way to stay connected with chemical weapons destruction plant activities.

Sign Up

Recent Tweets
  • Terms of Use
  • Freedom of Information Act
  • Privacy and Security Policy
  • iSALUTE
  • Archive
  • Welcome to ACWA
  • Home
  • PEO ACWA Pages
    • About PEO ACWA
    • Destruction Progress
    • Team Biographies
    • Chain of Command
    • Program Timeline
    • Public Involvement
  • PEO ACWA Media Library
    • PEO ACWA Media Library (Main)
    • PEO ACWA News
    • PEO ACWA Videos
    • PEO ACWA Facts
    • PEO ACWA Press Releases
    • PEO ACWA Briefings and Reports
    • Frequently Asked Questions
  • Blue Grass Pages
    • BGCAPP Homepage
    • BGCAPP Project Stages
    • BGCAPP Destruction Technologies
    • BGCAPP Team Biographies
    • Environmental Activities at BGCAPP
    • Public Involvement at BGCAPP
    • Hydrolysate Shipments
  • BGCAPP Media Library
    • BGCAPP Media Library (Main)
    • BGCAPP News
    • BGCAPP Videos
    • BGCAPP Facts
    • BGCAPP Press Releases
    • BGCAPP Briefings, Reports and Downloads
  • Pueblo Pages
    • PCAPP Homepage
    • PCAPP Project Stages
    • PCAPP Destruction Technologies
    • PCAPP Team Biographies
    • Environmental Activities at PCAPP
    • Public Involvement at PCAPP
  • PCAPP Media Library
    • PCAPP Media Library (Main)
    • PCAPP News
    • PCAPP Videos
    • PCAPP Facts
    • PCAPP Press Releases
    • PCAPP Briefings, Reports, and Downloads
  • Archive
  • Job and Business Opportunities
  • Contact Us
  • Freedom of Information Act
  • Privacy and Security Policy
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)