• Progress
  • eNewsletter Sign-Up
  • Frequently Asked Questions
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
  • HOME
  • PEO ACWA
    • ACWA logo

      Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)


      Mission: The safe elimination of chemical weapons at Pueblo and Blue Grass by Sept. 30, 2023

    • About PEO ACWA
      • Destruction Progress
      • Chain of Command
      • Team Biographies
      • Program Timeline
      • Program Legislation
      • Public Involvement
      • Frequently Asked Questions
    • PEO ACWA Media Library
      • PEO ACWA News
      • PEO ACWA Videos
      • PEO ACWA Facts
      • PEO ACWA Press Releases
      • PEO ACWA Briefings, Reports & Downloads
  • BLUE GRASS
    • pcapp_logo
      Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP)

      BGCAPP is safely destroying the chemical weapons stockpile currently in storage at the Blue Grass Army Depot near Richmond, Kentucky.

    • BGCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
      • Hydrolysate Shipments
    • BGCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • PUEBLO
    • pcapp_logo
      Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP)

      PCAPP is safely destroying the chemical weapons stockpile currently in storage at the U.S. Army Pueblo Chemical Depot in Colorado.

    • PCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
    • PCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • CONTACT US

Facts: Chemical Munitions at Blue Grass

Published: October 7, 2022 | Category: BGCAPP Facts

The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) is safely destroying the chemical weapons stockpile stored at the Blue Grass Army Depot, or BGAD. Located near Richmond, Kentucky, the depot provides conventional ammunition services, chemical defense equipment management and manufacturing capabilities for the Department of Defense. The Blue Grass Chemical Activity, a tenant of the 15,000-acre depot, is responsible for safekeeping the chemical weapons stockpile stored at the depot. Together, the U.S. Army and the community surrounding BGAD are working in a committed partnership to support the safe destruction of the stockpile.

The Blue Grass chemical weapons stockpile was originally comprised of 523 U.S. tons of weaponized blister and nerve agent in M55 rockets, 155mm projectiles and 8-inch projectiles. Destruction operations began in June 2019. The Program Executive Office, Assembled Chemical Weapons Alternatives is responsible for completing stockpile destruction operations by the Chemical Weapons Convention treaty commitment of Sept. 30, 2023. U.S. Public Law mandates stockpile destruction by Dec. 31, 2023.

8-INCH PROJECTILES, M426 (GB)

8-INCH PROJECTILES, M426 (GB)

Campaign Status: Complete | First munition destroyed: Jan. 17, 2020, Last munition destroyed: May 11, 2020

As of May 11, 2020, all 8-inch projectiles have been safely destroyed in Kentucky. Each 8-inch projectile weighed 203 pounds and was filled with approximately 14.5 pounds of liquified GB nerve agent. The agent was drained from the munitions and neutralized. Metal parts were decontaminated and recycled in accordance with all environmental laws and regulations.

155MM PROJECTILES, M110 (H)

155MM PROJECTILES, M110 (H)

Campaign Status: Complete | First munition destroyed: June 7, 2019, Last munition destroyed: Sept. 4, 2021

As of Sept. 4, 2021, all M110 155mm projectiles have been safely destroyed in Kentucky. The M110 155mm projectile was made of forged steel and filled with 11.7 pounds of blistering agent H, also known as mustard. In total, the munition, which contained a burster, weighed more than 94 pounds. BGCAPP destroyed 155mm projectiles filled with mustard agent using the Static Detonation Chamber. Remaining metal parts were recycled after the munitions were destroyed.

155MM PROJECTILE, M121A1 (VX)

155MM PROJECTILE, M121A1 (VX)

Campaign Status: Complete | First munition destroyed: Jan. 10, 2021, Last munition destroyed: May 28, 2021

As of May 28, 2021, all M121A1 155mm projectiles have been safely destroyed in Kentucky. The M121A1 155mm projectile was made of forged steel and filled with six pounds of VX nerve agent. In total, the munition weighed more than 98 pounds. BGCAPP destroyed these weapons using neutralization. Metal parts were decontaminated and recycled in accordance with all environmental laws and regulations.

115MM CHEMICAL ROCKETS, M55 (GB or VX)

155MM CHEMICAL ROCKETS, M55 (GB or VX)VX Campaign Status: Complete | First munition destroyed: July 9, 2021; Last munition destroyed: April 19, 2022
GB Campaign Status: Underway | First munition destroyed July 6, 2022

As of April 19, 2022, all M55 115mm rockets containing VX nerve agent have been safely destroyed in Kentucky. The campaign to destroy M55 115mm rockets containing GB nerve agent is underway. The M55 115mm rocket consists of a chemical agent filled M56 warhead attached to a M67 rocket motor. It has a diameter of 115 millimeters (4.44 inches) and together with its M441 shipping and firing tube container weighs a total of 77.5 pounds. The warhead is filled with 10 pounds of VX nerve agent or 10.7 pounds of GB nerve agent. BGCAPP is destroying these weapons using neutralization. The drained rocket warheads and overpacked munitions will be destroyed in a Static Detonation Chamber unit.

Download Fact Sheet
No tags.

BGCAPP Facts

  • Facts: Acronyms Commonly Used in the Chemical Weapons Destruction Program

  • Facts: Bechtel Parsons Blue Grass

  • Facts: Blue Grass ACWA Test Equipment

  • Facts: Blue Grass Chemical Stockpile Outreach Office

  • Facts: Blue Grass Rocket Destruction Process

  • Facts: Chemical Munitions at Blue Grass

  • Facts: Chemical Weapons Destruction at Blue Grass

  • Facts: Connect with the Blue Grass Chemical Agent-Destruction Pilot Plant

  • Facts: Employment and Business Opportunities

  • Facts: Environmental Permitting: Resource Conservation and Recovery Act

  • Facts: Hydrolysate Shipment Frequently Asked Questions

  • Facts: Information Repositories

  • Facts: Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Chemical Destruction Community Advisory Board

  • Facts: Nerve Agent Neutralization

  • Facts: Operation Swift Solution

  • Facts: Perimeter Air Monitoring

  • Facts: Personnel Reliability Program

  • Facts: Secondary Waste Treatment and Disposal

  • Facts: Static Detonation Chamber

Connect with PEO ACWA

Sign Up for Our Newsletter

Sign up for the Connect with ACWA e-newsletters to have information sent directly to your inbox. It’s a great way to stay connected with chemical weapons destruction plant activities.

Sign Up

Recent Tweets
  • Terms of Use
  • Freedom of Information Act
  • Privacy and Security Policy
  • iSALUTE
  • Archive
  • Welcome to ACWA
  • Home
  • PEO ACWA Pages
    • About PEO ACWA
    • Destruction Progress
    • Team Biographies
    • Chain of Command
    • Program Timeline
    • Public Involvement
  • PEO ACWA Media Library
    • PEO ACWA Media Library (Main)
    • PEO ACWA News
    • PEO ACWA Videos
    • PEO ACWA Facts
    • PEO ACWA Press Releases
    • PEO ACWA Briefings and Reports
    • Frequently Asked Questions
  • Blue Grass Pages
    • BGCAPP Homepage
    • BGCAPP Project Stages
    • BGCAPP Destruction Technologies
    • BGCAPP Team Biographies
    • Environmental Activities at BGCAPP
    • Public Involvement at BGCAPP
    • Hydrolysate Shipments
  • BGCAPP Media Library
    • BGCAPP Media Library (Main)
    • BGCAPP News
    • BGCAPP Videos
    • BGCAPP Facts
    • BGCAPP Press Releases
    • BGCAPP Briefings, Reports and Downloads
  • Pueblo Pages
    • PCAPP Homepage
    • PCAPP Project Stages
    • PCAPP Destruction Technologies
    • PCAPP Team Biographies
    • Environmental Activities at PCAPP
    • Public Involvement at PCAPP
  • PCAPP Media Library
    • PCAPP Media Library (Main)
    • PCAPP News
    • PCAPP Videos
    • PCAPP Facts
    • PCAPP Press Releases
    • PCAPP Briefings, Reports, and Downloads
  • Archive
  • Contact Us
  • Freedom of Information Act
  • Privacy and Security Policy
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)