Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Recap – July 2022

Highlights

Main Plant Update:

  • The main plant is using neutralization to destroy nerve-agent munitions. During operations, hydrolysate and non-agent-contaminated rocket motors, both considered secondary waste, are being shipped to permitted waste disposal facilities for final destruction.
  • GB nerve agent 8-inch projectile destruction began in January 2020 and was completed in May 2020.
  • VX nerve agent 155mm projectile destruction began in January 2021 and was completed in May 2021.
  • VX nerve agent M55 rocket destruction began in July 2021 and was completed in April 2022.
  • This Month:
  • The first M55 rocket containing GB nerve agent was destroyed July 6.
  • Adjusting and tuning of equipment during the slow and deliberate processing ramp-up period.
  • First delivery of drained GB rocket warheads to temporary storage at the Blue Grass Chemical Activity to await destruction in one of the plant’s Static Detonation Chamber (SDC) units.

SDC 2000 Update:

  • The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will use an additional SDC to destroy a portion of the nerve-agent munitions, including full rocket overpacks and secondary waste products from destruction of the nerve-agent rockets, such as drained GB rocket warheads.
  • This Month:
    • Verification checks for upcoming turnover of the electrical distribution system to the systemization team.
    • Tuning of Thermal Oxidizer/Off-gas Treatment System.
    • Commissioning of hydraulic power system.

SDC 1200 Update:

  • BGCAPP is converting the Explosive Destruction Technology (EDT), previously used to destroy the mustard-agent munitions, into the SDC 1200 to destroy secondary waste products from destruction of the nerve-agent rockets, drained VX rocket warheads, and potentially drained and undrained GB rocket warheads.
  • This Month:
    • Setting and aligning conveyors.
    • Testing of heating, ventilation and air conditioning system return ducts.
    • Concrete work for tank area foundation and curbs.

EDT Facility

  • The EDT facility at BGCAPP used an SDC to destroy the mustard-agent munitions.
  • Mustard-agent 155mm projectile destruction began in June 2019 and was completed in September 2021.

Upcoming Meetings

The next Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Chemical Destruction Community Advisory Board meeting will be held:
Sept. 15, 2022, at 1:30 p.m. ET
Carl D. Perkins Building, Rooms A and B
Eastern Kentucky University
Richmond, Kentucky

For information about the meeting, contact the Blue Grass Chemical Stockpile Outreach Office at (859) 626-8944 or bgoutreach@iem.com.

New to BGCAPP?

The Blue Grass Chemical Agent-Destruction Pilot Plant is a state-of-the-art facility safely destroying the chemical weapons stockpile in storage at the Blue Grass Army Depot near Richmond, Kentucky. The main plant is using neutralization to destroy the nerve-agent stockpile. The decision was made to not use the supercritical water oxidation system to process hydrolysate, the product of the neutralization process. This secondary waste is shipped to a licensed and permitted hazardous waste treatment, storage and disposal facility. A Static Detonation Chamber (SDC) destroyed the mustard agent stockpile. This SDC, along with a larger SDC 2000, will augment the main plant by destroying drained rocket warheads and overpacked rockets, and potentially undrained rocket warheads. The safety of the workforce and the environment, as well as of the neighboring communities, is the program’s most important priority.