• COVID-19
  • Progress
  • eNewsletter Sign-Up
  • Frequently Asked Questions
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
  • HOME
  • PEO ACWA
    • ACWA logo

      Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)


      Mission: The safe elimination of chemical weapons at Pueblo and Blue Grass by Sept. 30, 2023

    • About PEO ACWA
      • Destruction Progress
      • Chain of Command
      • Team Biographies
      • Program Timeline
      • Program Legislation
      • Public Involvement
      • Frequently Asked Questions
    • PEO ACWA Media Library
      • PEO ACWA News
      • PEO ACWA Videos
      • PEO ACWA Facts
      • PEO ACWA Press Releases
      • PEO ACWA Briefings, Reports & Downloads
  • BLUE GRASS
    • pcapp_logo
      Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP)

      BGCAPP is safely destroying the chemical weapons stockpile currently in storage at the Blue Grass Army Depot near Richmond, Kentucky.

    • BGCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
      • Hydrolysate Shipments
    • BGCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • PUEBLO
    • pcapp_logo
      Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP)

      PCAPP is safely destroying the chemical weapons stockpile currently in storage at the U.S. Army Pueblo Chemical Depot in Colorado.

    • PCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
    • PCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • CONTACT US

First GB Nerve Agent Rocket Destroyed at Kentucky Plant

Published: July 7, 2022 | Category: BGCAPP Press Releases

Contact:
Sarah Marko
Communications Manager
(859) 582-8472
(859) 626-8944
mhyork@bechtel.com

BLUE GRASS ARMY DEPOT, Ky. – The first M55 rocket containing GB nerve agent was destroyed at the Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) July 6.

“The GB rockets are the last type of chemical weapons to be destroyed at the Blue Grass Army Depot,” said Dr. Candace Coyle, BGCAPP site project manager. “We are committed to safely eliminating the remaining U.S. chemical weapons stockpile by 2023 and then safely closing the plant.”

The M55 rockets containing GB nerve agent represent more than 50% of the original chemical weapons stockpile safely stored at the Blue Grass Army Depot (BGAD). Initially, five different kinds of chemical agent-filled weapons were stored at BGAD: 155mm projectiles containing mustard agent, 155mm projectiles containing VX nerve agent, 8-inch projectiles containing GB nerve agent, M55 rockets containing VX nerve agent and M55 rockets containing GB nerve agent.

Chemical weapons destruction operations began at BGCAPP on June 7, 2019. Trained operators have overseen the safe destruction of 246.7 U.S. tons of chemical agent. A total of 276.6 U.S. tons of chemical agent remains to be destroyed in Kentucky.

Reactions:

“Our constant theme throughout every campaign has been ‘safety’ and it will remain our theme as we destroy rockets containing GB nerve agent,” said Ron Hink, Bechtel Parsons Blue Grass (BPBG) project manager. “Our Blue Grass team is ready to finish our mission of destroying every chemical weapon stored in Kentucky.”

“I’m proud of the chemical demilitarization work completed by the BGCAPP team, which operates hand-in-hand with the depot’s supporting structure and environmental compliance offices,” said Col. Stephen Dorris, BGAD commander. “The safe completion of four of the five chemical surety material campaigns in just three years is truly noteworthy. It’s amazing to think that the GB rocket campaign is all that’s left to safely neutralize after so many years of hard work safely storing and securing the various GB, VX, and mustard agent material. These next several months will undoubtedly be filled with challenges, but I’m confident in the ability of the dedicated professionals Team BGAD has working to complete this very important mission. Following the completion of this important chemical surety mission, the depot remains postured to continue its daily lethal and non-lethal, material support mission to the Joint Warfighter. The depot was here long before chemical surety material was ever moved here, and we plan to continue the receipt, storage, maintenance, shipment and demilitarization of conventional munitions and material for many years into the future.”

“Blue Grass Chemical Activity is proud to support BGCAPP in the destruction of the GB rocket stockpile, the final chemical weapons campaign,” said Lt. Col. Tyler McKee, Blue Grass Chemical Activity commander. “The entire Blue Grass Chemical Activity workforce is prepared to enthusiastically and safely support this historic effort.”

“They really are starting on destroying the last chemical weapons in the U.S. stockpile,” said Dr. Doug Hindman, Kentucky Chemical Demilitarization Citizens’ Advisory Commission chair. “That’s an achievement we’ve all worked toward for years. Once they finish, safely, America will be totally free of stored chemical weapons.”

Background:

Under the observation of trained operators, automated equipment will disassemble more than 51,000 rockets and drain the chemical agent. The agent will be neutralized by mixing it with water and caustic to produce hydrolysate. After the agent is confirmed destroyed, the hydrolysate will be pumped to holding tanks. From there, the hydrolysate will be safely shipped via tanker trucks and further processed at Veolia Environmental Services in Texas.

The drained rocket warheads will be containerized and placed in temporary storage at BGAD. Marked as secondary waste, they will be destroyed in a Static Detonation Chamber (SDC) unit located at BGCAPP. Full rockets that have leaked in the past and been overpacked will also be destroyed in an SDC at BGCAPP. The non-contaminated rocket motors will be shipped to Anniston, Alabama, to be destroyed in an SDC.

The Program Executive Office, Assembled Chemical Weapons Alternatives is responsible for destroying the remaining U.S. chemical weapons stockpile in Colorado and Kentucky. The organization oversees the contract for design, construction, systemization, operation and closure of BGCAPP with BPBG and teaming partners Amentum, Battelle Memorial Institute and GP Strategies. The project also works closely with community advisory groups to keep them informed about chemical weapons destruction progress.

The chemical weapons stockpile at the depot originally consisted of 523 U.S. tons of chemical agent. In June 2019, the BGCAPP team began destroying more than 15,000 155mm projectiles containing mustard agent using an SDC. The mustard agent destruction campaign completed in September 2021. A “campaign” refers to destruction of a particular type of chemical munition. From January through May 2020, nearly 4,000 8-inch projectiles containing GB nerve agent were destroyed at BGCAPP. From January through May 2021, nearly 13,000 155mm projectiles containing VX nerve agent were destroyed. From July 2021 through April 2022, more than 17,000 M55 rockets containing VX nerve agent were destroyed.

The stockpile sites in Colorado and Kentucky account for the last 10% of what was originally a national stockpile of more than 30,000 tons of chemical weapons. The U.S. Army Chemical Materials Activity (then Agency) destroyed the initial 90%, which was stored at seven other sites across the U.S. and on Johnston Atoll in the Pacific. Chemical weapons destruction in Colorado began in 2015.

Both sites are on target to complete destruction of the chemical weapons stockpile by the Chemical Weapons Convention treaty commitment of Sept. 30, 2023, and before the congressional deadline of Dec. 31, 2023. After chemical weapons destruction operations are completed, the closure phase will continue beyond that time for an additional three to four years. BGAD will continue its conventional weapons missions beyond the BGCAPP closure phase.

###

Photo caption: Blue Grass Chemical Agent-Destruction Pilot Plant operators place the first M55 rocket containing GB nerve agent on a conveyor to begin the destruction process July 6, 2022. The GB nerve agent M55 rockets are the last type of chemical weapons to be destroyed in Kentucky. (U.S. Army photo)

Photo caption: Blue Grass Chemical Agent-Destruction Pilot Plant operators place the first M55 rocket containing GB nerve agent on a conveyor to begin the destruction process July 6, 2022. The GB nerve agent M55 rockets are the last type of chemical weapons to be destroyed in Kentucky. (U.S. Army photo)

Download Press Release
No tags.

BGCAPP Press Releases

  • All Mustard Agent Projectiles Now Destroyed in Kentucky

  • All Nerve Agent Projectiles Now Destroyed at Blue Grass Army Depot

  • Blue Grass Plant Completes First Munitions Destruction Campaign

  • Blue Grass Plant Destroys 25% of Chemical Agent Stockpile in Kentucky

  • Chemical Weapons Facility Announces Construction Complete

  • Chemical Weapons Facility Prepares for Operations

  • Chemical Weapons Facility to Test Public Address System

  • Chemical Weapons Facility’s Control Room Becomes Fully Operational

  • Destruction of Chemical Weapons Stockpile Begins at Blue Grass Army Depot

  • Entire U.S. Stockpile of VX Nerve Agent Eliminated

  • Event to Mark the Start of Chemical Weapons Stockpile Destruction Set for May 29

  • First GB Nerve Agent Rocket Destroyed at Kentucky Plant

  • First Nerve Agent Rockets Destroyed at Blue Grass Army Depot

  • Nerve Agent Destruction Begins at Blue Grass Army Depot

  • No Significant Environmental Impact Anticipated from Additional Chemical Weapons Destruction Equipment

  • Public Comment Period Opens for Blue Grass Army Depot Environmental Assessment

  • Start of Agent Operations in Kentucky Commemorated in May 29 Event

  • Static Detonation Chamber 2000 Begins Operations at Blue Grass Plant

  • VX Nerve Agent Destruction Begins at Blue Grass Army Depot

Connect with PEO ACWA

Sign Up for Our Newsletter

Sign up for the Connect with ACWA e-newsletters to have information sent directly to your inbox. It’s a great way to stay connected with chemical weapons destruction plant activities.

Sign Up

Recent Tweets
  • Terms of Use
  • Freedom of Information Act
  • Privacy and Security Policy
  • iSALUTE
  • Archive
  • Welcome to ACWA
  • Home
  • PEO ACWA Pages
    • About PEO ACWA
    • Destruction Progress
    • Team Biographies
    • Chain of Command
    • Program Timeline
    • Public Involvement
  • PEO ACWA Media Library
    • PEO ACWA Media Library (Main)
    • PEO ACWA News
    • PEO ACWA Videos
    • PEO ACWA Facts
    • PEO ACWA Press Releases
    • PEO ACWA Briefings and Reports
    • Frequently Asked Questions
  • Blue Grass Pages
    • BGCAPP Homepage
    • BGCAPP Project Stages
    • BGCAPP Destruction Technologies
    • BGCAPP Team Biographies
    • Environmental Activities at BGCAPP
    • Public Involvement at BGCAPP
    • Hydrolysate Shipments
  • BGCAPP Media Library
    • BGCAPP Media Library (Main)
    • BGCAPP News
    • BGCAPP Videos
    • BGCAPP Facts
    • BGCAPP Press Releases
    • BGCAPP Briefings, Reports and Downloads
  • Pueblo Pages
    • PCAPP Homepage
    • PCAPP Project Stages
    • PCAPP Destruction Technologies
    • PCAPP Team Biographies
    • Environmental Activities at PCAPP
    • Public Involvement at PCAPP
  • PCAPP Media Library
    • PCAPP Media Library (Main)
    • PCAPP News
    • PCAPP Videos
    • PCAPP Facts
    • PCAPP Press Releases
    • PCAPP Briefings, Reports, and Downloads
  • Archive
  • Job and Business Opportunities
  • Contact Us
  • Freedom of Information Act
  • Privacy and Security Policy
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)