• COVID-19
  • Progress
  • eNewsletter Sign-Up
  • Frequently Asked Questions
  • Give Feedback
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
  • HOME
  • PEO ACWA
    • ACWA logo

      Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)


      Mission: The safe elimination of chemical weapons at Pueblo and Blue Grass by Sept. 30, 2023

    • About PEO ACWA
      • Destruction Progress
      • Chain of Command
      • Team Biographies
      • Program Timeline
      • Program Legislation
      • Public Involvement
      • Frequently Asked Questions
    • PEO ACWA Media Library
      • PEO ACWA News
      • PEO ACWA Videos
      • PEO ACWA Facts
      • PEO ACWA Press Releases
      • PEO ACWA Briefings, Reports & Downloads
  • BLUE GRASS
    • pcapp_logo
      Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP)

      BGCAPP is safely destroying the chemical weapons stockpile currently in storage at the Blue Grass Army Depot near Richmond, Kentucky.

    • BGCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
      • Hydrolysate Shipments
    • BGCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • PUEBLO
    • pcapp_logo
      Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP)

      PCAPP is safely destroying the chemical weapons stockpile currently in storage at the U.S. Army Pueblo Chemical Depot in Colorado.

    • PCAPP Homepage
      • Project Stages
      • Destruction Technologies
      • Team Biographies
      • Environmental Activities
      • Public Involvement
    • PCAPP Media Library
      • News
      • Videos
      • Facts
      • Press Releases
      • Briefings, Reports & Downloads
  • CONTACT US

Facts: Munitions Washout System

Published: April 12, 2021 | Category: PCAPP Facts
Projectiles and mortars entering the Agent Processing Building will first visit a station called the Munitions Washout System, which consists of two Cavity Access Machine arrays that have four lines each.

Projectiles and mortars entering the Agent Processing Building will first visit a station called the Munitions Washout System, which consists of two Cavity Access Machine arrays that have four lines each.

The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) is safely and efficiently destroying chemical weapons stored at the U.S. Army Pueblo Chemical Depot. Technology known as neutralization followed by biotreatment is used to destroy the mustard agent contained in the projectiles.

First-of-a-kind equipment assists with this process, including the Munitions Washout System (MWS). The entire process is safely monitored and controlled by operators in a remote station. The diagram below illustrates the process.

  • Step 1: the MWS robotic arm places the 105mm projectiles upside-down in a device known as a Cavity Access Machine (CAM).
  • Step 2: the CAM operates by hydraulically pushing the burster well (a tube in the middle of the projectile) into the munition.
  • Step 3: the collapsed burster will create an opening for the agent to drain from the munition.
  • Step 4: in this final step, hot, high-pressure water is sprayed into each munition to assist in cleaning out any agent residue. The chemical agent and rinse water from the MWS is piped to another area for subsequent neutralization processing.

The MWS consists of two operating lines, each designed to process up to 50 105mm projectiles or up to 32 155mm projectiles per hour during the first campaign. All drained material will be collected and pumped directly into the neutralization bay.

To learn more, view the PCAPP Munitions Washout System video.

 

Projectiles and mortars entering the Agent Processing Building will first visit a station called the Munitions Washout System, which consists of two Cavity Access Machine arrays that have four lines each.

Projectiles and mortars entering the Agent Processing Building will first visit a station called the Munitions Washout System, which consists of two Cavity Access Machine arrays that have four lines each.

Some munitions will not be able to be easily processed through the main destruction plant. These problematic munitions include those that have leaked in the past and are overpacked, as well as “rejects” whose condition does not allow for automated processing. These munitions will be safely processed in PCAPP’s Static Detonation Chambers.

Download Fact Sheet
PCAPP Equipment

PCAPP Facts

  • Facts: Acronyms Commonly Used in the Chemical Weapons Program

  • Facts: ACWA Test Equipment (ATE)

  • Facts: Agent Filtration Area

  • Facts: Automated Guided Vehicle

  • Facts: Baseline Reconfiguration

  • Facts: Biotreatment Process

  • Facts: Chemical Munitions at Pueblo

  • Facts: Chemical Weapons Destruction at the U.S. Army Pueblo Chemical Depot

  • Facts: Colorado Chemical Demilitarization Citizens’ Advisory Commission

  • Facts: Employment and Subcontracting Information

  • Facts: Hydrolysate Overview

  • Facts: Munitions Handling Lift Assist

  • Facts: Munitions Treatment Unit

  • Facts: Neutralization Followed by Biotreatment

  • Facts: Partners in the Pueblo Chemical Weapons Destruction Program

  • Facts: PCAPP Employment Frequently Asked Questions

  • Facts: PCAPP Training Facility

  • Facts: Personnel Reliability Program

  • Facts: Projectile/Mortar Disassembly System

  • Facts: Static Detonation Chamber

  • Facts: The Treatment or Disposal of Secondary Wastes

  • Facts: Understanding Operations Terminology

  • Facts: Water for Weapons Destruction: Source, Quantity, Groundwater Protection

Connect with PEO ACWA

Sign Up for Our Newsletter

Sign up for the Connect with ACWA e-newsletters to have information sent directly to your inbox. It’s a great way to stay connected with chemical weapons destruction plant activities.

Sign Up

Recent Tweets
  • Terms of Use
  • Freedom of Information Act
  • Privacy and Security Policy
  • iSALUTE
  • Archive
  • Welcome to ACWA
  • Home
  • PEO ACWA Pages
    • About PEO ACWA
    • Destruction Progress
    • Team Biographies
    • Chain of Command
    • Program Timeline
    • Public Involvement
  • PEO ACWA Media Library
    • PEO ACWA Media Library (Main)
    • PEO ACWA News
    • PEO ACWA Videos
    • PEO ACWA Facts
    • PEO ACWA Press Releases
    • PEO ACWA Briefings and Reports
    • Frequently Asked Questions
  • Blue Grass Pages
    • BGCAPP Homepage
    • BGCAPP Project Stages
    • BGCAPP Destruction Technologies
    • BGCAPP Team Biographies
    • Environmental Activities at BGCAPP
    • Public Involvement at BGCAPP
    • Hydrolysate Shipments
  • BGCAPP Media Library
    • BGCAPP Media Library (Main)
    • BGCAPP News
    • BGCAPP Videos
    • BGCAPP Facts
    • BGCAPP Press Releases
    • BGCAPP Briefings, Reports and Downloads
  • Pueblo Pages
    • PCAPP Homepage
    • PCAPP Project Stages
    • PCAPP Destruction Technologies
    • PCAPP Team Biographies
    • Environmental Activities at PCAPP
    • Public Involvement at PCAPP
  • PCAPP Media Library
    • PCAPP Media Library (Main)
    • PCAPP News
    • PCAPP Videos
    • PCAPP Facts
    • PCAPP Press Releases
    • PCAPP Briefings, Reports, and Downloads
  • Archive
  • Job and Business Opportunities
  • Contact Us
  • Freedom of Information Act
  • Privacy and Security Policy
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)